BackBack to Projects
Industrial ProjectsMining
BHP South Flank Mine Conveyor Platform Reference
A comprehensive steel grating solution engineered for the demanding requirements of the Mining sector.
Location
Asia Pacific
Client
BHP
Completed
First ore May 2021
Total Area
Public scale: 80 Mtpa mine; Mining Area C hub producing 145 Mtpa.

The Challenge
Public project context: South Flank is an 80 Mtpa iron ore mine with crushing, screening, conveyor, stockyard and train-loading infrastructure. Mining access surfaces must handle abrasive dust, frequent inspection routes and safe drainage around conveyors and transfer points.
The Solution
Application reference: galvanized or painted heavy-duty steel grating is suitable for mine walkways, transfer platforms and inspection decks when specified with serrated bars, edge banding and removable panels. This record does not claim Kingcats supplied South Flank.
Project Gallery



Technical Specifications
- Material GradeTypical reference: S235JR/A36 or equivalent carbon steel; final project grade not disclosed.
- Surface TreatmentTypical reference: hot-dip galvanizing or industrial coating by mining environment.
- Bearing Bar SizeTypical reference: 40x5 mm or heavier bearing bars for mining access spans.
- Mesh PitchTypical reference: 30x100 mm or 34x101 mm pitch with serrated option.
- Load CapacityTypical reference: maintenance foot traffic plus mining inspection tool loads.
